Mt Webber Project

Testament to the strength of BGC Contracting’s existing relationship with Atlas Iron through the Wodgina Iron Ore Project, BGC was awarded their second major greenfield mining project with Atlas Iron at Mt. Webber, located near Marble Bar in the Pilbara region.

Testament to the strength of BGC Contracting’s existing relationship with Atlas Iron through the Wodgina Iron Ore Project, BGC was awarded their second major greenfield mining project with Atlas Iron at Mt. Webber, located near Marble Bar in the Pilbara region.

MINERAL PROCESSING CONTRACT

The initial contract was for the construction and operation of a 3 stage mineral processing circuit, sampling station and 2 radial stackers that can stockpile up to 180,000 tonnes of final product.

The circuit was designed, installed and operated by BGC Contracting to produce 3 mtpa of minus 12mm hematite iron ore. The design also has a built in additional 3mtpa “bolt on” upgrade capability for future expansion to scale production up to 6 mtpa. The state-of-the-art fixed plant went from concept to completion in 10 months.

MINING SERVICES CONTRACT

A second contract was also awarded around the same time for the development work and contract mining for Mt. Webber. The project value is in the order of $300 million with approximately 3.9 million BCM of material moved per annum.

Client: Atlas Iron Ltd

Status:
Current
Location:
Western Australia
Value:
$300 Million
Capabilities: